Lesson 7 Objectives

At the end of this lesson, you will be able to:

  • Analyze LOMA and LOMR-F applications to determine if they will be approved or denied
  • Analyze LOMA and LOMR-F applications to identify potential violations
General LOMC Timeline
The timeline for the review and determination of a Letter of Map Change (LOMC) application depends on the type of LOMC requested.

LOMC Review and Determination Period timeline. LOMA, CLOMA, LOMR-F, and CLOMR-F application submitted - 60 days. LOMR and CLOMR applications submitted (includes the approval of all data submitted) - 90 days

Once submitted, the timeline for FEMA to process applications is as follows:

  • Once all requested information is received, CLOMA, LOMA, CLOMR-F, and LOMR-F applications have a 60-day review and determination period
  • LOMR and CLOMR applications have a 90-day review and determination period, after the approval of all data submitted
General LOMC Review Process

The general LOMC review and determination process is as follows:

  • FEMA reviews and evaluates applications for completeness and accuracy
  • It is an iterative process and deadlines are important. For example, if the deadline is not met, the clock restarts on the application, the case is suspended (no longer being processed) and will cost an additional fee to get it started again
  • Once FEMA approves or denies the map amendment, FEMA sends the letter to the applicant, the local community (or communities), and the State NFIP coordinator. The letter is also filed in the FEMA Map Service Center
  • Letters can be retrieved from the FEMA Map Service Center
  • Changes to flood maps are incorporated into the National Flood Hazard Layer (NFHL)
  • Submittal of the application does not guarantee approval
A flowchart diagram that shows the FEMA general review and determination process for Letters of Map Change applications. See Appendix for alt text description.
FEMA Review Process

When a LOMC application is received at FEMA, the package is first checked to ensure that all the appropriate forms, required technical supporting information, and the correct review and processing fee are included. Complete packages receive a FEMA case number.

Next, a reviewer examines the LOMC application forms and data for completeness. If more information is required to make a determination, the submitter will be contacted by telephone or letter.

If the forms and data are complete, a case reviewer will perform the technical review of the request, comparing it to effective data and noting other requests that may affect the determination of the request. During this step, the submitter will be contacted by telephone or letter if additional information is required to complete the review. In that case, the review is suspended until the required information is received. If the information is not received within 90 days, the application processing will be suspended. Late submittals are treated as original submissions and will be subject to all payment requirements.

If the LOMC request is approved, the appropriate Determination Document is reviewed and signed by the FEMA Project Engineer. The signed Determination Document is then mailed to the submitter.

A flowchart that displays the FEMA Review Process for LOMR applications. See Appendix for alt text description.
LOMC Review Questions
Basis for Approval
  • Has the appropriate fee been submitted?
  • Are all forms completed and all required documentation is attached?
  • Is an annotated FIRM included?
  • Are all form fields populated, using N/A when appropriate?
  • Is the lowest adjacent grade (LAG) at or above the BFE for LOMC requests for one or more structures?
  • Is the lowest lot elevation (LLE) at or above the BFE for LOMC requests for one or more lots?
  • Are the elevations certified by a licensed land surveyor, registered professional engineer or architect?
  • Is the land and any existing or proposed structures to be removed from the Special Flood Hazard Area (SFHA) “reasonably safe from flooding”?

For more information on LAG and LLE at or above the BFE, refer to Guidance for Flood Risk Analysis and Mapping: MT-1 Technical Guidance, available at 'http://www.fema.gov/media-library/assets/documents/34953

Definition of Lowest Lot Elevation
For an entire property, the lowest lot elevation (LLE) is defined as the lowest ground elevation on the legally recorded property (recorded deed or plat). The LLE is measured to the nearest tenth (0.1) of a foot or meter.
Approvals

What gets approved?

  • The LOMC application to remove a structure, a lot or portion of a lot from the SFHA

How does an application get approved?

  • The MT-EZ or MT-1 forms or eLOMA requests are submitted to FEMA for review. In some cases, FEMA may request more information

What does approval mean?

  • A legal letter or Determination Document from FEMA states that a structure, lot, or portion thereof, is removed from the SFHA
Denials

Letter of Map Amendment (LOMA) and Letter of Map Revision--Based on Fill (LOMR-F) applications will be denied under the following site conditions:

  • Natural lowest adjacent grade (LAG) of any portion of a structure, including attached garage, deck or steps, is lower than the BFE
  • Finished LAG of any portion of a structure elevated on fill, including attached garage, deck or steps, is lower than the BFE
  • Natural lowest lot elevation (LLE) for property, or portion of property to be excluded from the floodplain, is lower than the BFE
  • Finished LLE of property, or portion of property to be excluded from the floodplain by placement of fill, is lower than the BFE
  • Structure is located seaward of the inland limit of a primary frontal dune in a coastal Zone V or Zone VE
  • Structural fill was used in a coastal Zone V or Zone VE
  • Property and/or structures are in alluvial fan flood hazard areas
Denials (cont.)

A request must be processed as a Letter of Map Revision (LOMR) request if:

  • The development causes or is affected by significant SFHA changes or BFE changes
  • Fill was placed in the floodway, including compensatory storage and excavation; review of a no rise certification is outside of the scope of a LOMR-F review
  • The project includes channelization projects, bridge/culvert replacement projects, or other flood control improvements; review of work within a stream channel is outside of the scope of a LOMR-F review
What Does Denial Mean?

The lot, portion of a lot, or structure will remain legally in the SFHA.

No BFEs or floodplain boundaries are changed.

National Flood Insurance Program (NFIP) development and flood insurance requirements remain.

Project may be in violation of community regulations.

The applicant may submit another application with more accurate data.

Potential Floodplain Management Violations

Potential violations discovered during the LOMC application review process are flagged and sent to the FEMA Region for investigation.

  • Lowest floor elevation (LFE)
    • A LOMC will not be granted if the lowest floor elevation (LFE), including the basement of any existing structure, is below the BFE. This is sometimes seen with post-fill basements
  • Zone AO construction
    • Lowest floor is below the highest adjacent grade (HAG) plus the base flood depth number. If there is no base flood depth number on the FIRM, then the lowest floor cannot be less than 2 feet above the HAG
  • Zone V or VE construction
    • According to 44 CFR 60.3 (6) (available at www.law.cornell.edu/cfr/text/44/60.3), the placement of structural fill (fill used to support a structure) is prohibited in Zone V areas
    • Alteration of a sand dune which would increase potential flood damage. (Structures located seaward of the inland limit of the Primary Frontal Dune are not eligible for LOMAs.)
    • Construction on a sand dune or mangrove stand that would increase potential flood damage. This includes demolition of a pre-FIRM structure on a dune and replacing it with a new building
  • Floodway violations
    • If any LOMC application includes property in the floodway, the community Floodplain Administrator (FPA) must determine if land in the floodway has been elevated by fill. If the fill has not been permitted, then it is a violation. If the fill is permitted but causes any measurable increase in the BFE, then it is a violation
Note Icon
Note
Not every potential violation is an actual violation. For example, pre-FIRM structures are never flagged as violations.
Definition of Lowest Floor Elevation
The lowest floor elevation (LFE) is determined by comparing the lowest floor of the structure with the Base Flood Elevation (BFE) to determine the elevation difference. It can be the lowest floor of the lowest enclosed area, except for unfinished or flood-resistant enclosures used solely for parking of vehicles, building access, or storage. The floor of a basement (where “basement” means the floor is below grade on all sides) will always be the lowest floor, regardless of how the space is used.
Lesson 7 Resources

Lesson 7 Review

In this lesson we discussed:

  • The general timelines and processes for LOMC applications
  • The LOMC application review process
  • The reasons why LOMA or LOMR-F applications may be approved or denied