Electrical Systems Mitigation Measures (1 of 2)

The mitigation measures must meet all eligibility requirements. There may be instances where these measures are required by codes or standards.

FEMA considers the following mitigation measures to be cost-effective if the measures do not exceed 100 percent of the eligible repair cost (prior to any insurance reductions), as long as they are listed in Appendix J in the Public Assistance Policy and Program Guide.

Electrical Power Systems

  • Provide looped distribution service or other redundancies in the electrical service to critical facilities, such as hospitals and fire stations.
  • Install surge suppressors and lightning arrestors.
  • Transformers:
    • Elevate pad transformers above the Base Flood Elevation
    • Support pole-mounted transformers with multiple poles