FEMA may approve changes to the pre-disaster design or construction method (including materials) if the changes are required due to:
- Access issues
- Site conditions, or
- To tie in to existing infrastructure
The changes must not impact the capacity or function of the facility.
The Applicant must show that the changes are reasonable based on the type and extent of restoration and are consistent with the Applicant's general construction practices.