The Grants Portal header is at the top of the screen. The Grants Portal logo is on the left, followed by the title "Grants Portal." A user icon is on the right, followed by the name "Oz, Memmet," followed by a drop-down arrow. On the left of the screen is the navigation menu. The tabs, from top to bottom, read "Dashboard," "My Organization," "My Tasks," "Utilities," and "Intelligence." Below the "My Organization" tab, text reads "Georgia Department of Public Health (006-U54NX-00)." The "My Organization" tab is expanded, and the options read, from top to bottom, "Organization Profile," "Event PA Requests," "Projects," "Damages," and "Work Orders."
Pertinent visual information:
The "Sign Recovery Transition Meeting" section is displayed. In the top left corner is the section header that reads "Sign Recovery Transition Meeting." In the top right corner are two tabs: a green tab that reads "Submit," and a white tab that reads "Cancel." Below is a window titled "Please review and sign." The window has text that reads "The PDMG for Georgia Department of Public Health conducted an RTM on 11/08/2017. The RTM checklist specifies the material that was discussed during the meeting. As a reminder:
- The Applicant must maintain complete records and cost documentation for all approved work for at least three years from the date the Applicant's grant is officially closed. The Recipient may require Applicants to maintain records for longer.
- In accordance with _206.206 of 44CFR, Applicants may appeal any determination to an application for or the provision of Federal assistance, but must do so within 60 days from receipt of determination.
- All work must comply with provisions of the Clean Water Act, Clean Air Act, Resource Conservation and Recovery Act, Endangered Species Act, Fish and Wildlife Coordination Act, the National Historic Preservation Act, and related Federal status and associated State, Tribal and local laws, codes, ordinances and other statutes.
Any questions regarding the Public Assistance, changes to the Approved Scope of Work, Improved or Alternate Projects, 406 Hazard Mitigation, and/or major cost overruns that require prior approval from FEMA, please contact No Recipient POC Assigned." Below is a heading that reads "Certification" and is underlined. Below this heading is text that reads "To the best of my knowledge and understand, Project Worksheets have been written for all known damages and for all other disaster received costs claimed under the Public Assistance Program for this disaster. Exceptions may include inundated or inaccessible sites and demolition-related projects. I have also read and understand that import time lines noted above and will with Federal, State, and local statutes and ordinances in completing disaster-related work under the Public Assistance Grant. In addition, I have been provided a copy of the D 1 Project Worksheet Report." Below is a text box labeled "Signature," with text in the box reading "Signature here" and an orange button to its right that reads "Click to Sign." To the right is a text box labeled "Date," with text in the box reading "11/09/2017."