Restoring the pre-disaster carrying or storage capacity of engineered channels, debris and sediment basins, storm water detention and retention basins, and reservoirs may be eligible, but only if the Applicant provides documentation to establish:
- The pre-disaster capacity of the facility; and
- That the Applicant maintains the facility on a regular schedule
If the Applicant chooses to remove non-incident-related material along with that deposited as a result of the incident, the project is considered an Improved Project.