Risk Considerations (1 of 3)
| An important element of evaluating retrofitting options is understanding the risk associated with a do-nothing approach and with each retrofitting measure. Risk can be established by determining:
- The exceedance probability of specific flood magnitudes
- The flood protection elevation offered by each retrofitting method under consideration
|
|