Checklist: Electrical Connection
| - Has facility electrical system been correctly and completely isolated from electrical grid?
- Is equipment grounded per NEC and applicable regulations?
- Is the correct PPE being used for the level of work being performed?
- Are Lock-Out Tag-Out processes required and followed?
- Are electrical system “cold start” processes in place and followed?
- Are applicable Arc Flash PPE and procedures being followed?
- Are the correct material(s) being sized and used for electrical connections?
Audio Transcript |
|